![]() As you add more weight with sections, check to make sure you arent sinking into soft ground unevenly. Buying those screw adjustable levelers to put under the first section is the best thing I did. Sometimes you have to be creative, but make sure you get the first section square and level. As far as the cross bars and planks, You can alternate climbing and placing pieces higher within the tower.Īs far as tying off, when I get to 3 sections tall I use the outriggers on the base and I've run ropes through double windows and tied them off inside, I've drilled lags with eye hooks into the house or building to tie off to, then removed them as I disassembled the tower on the way down. I don't see how you could climb and carry one of those frames at the same time. I hope you can kind of visualize that, it's kind of convuluted sounding.īeen doing it that way for years. ![]() Hopefully I've remembered to get extra planking and cross bars up before this point so I can finish tying the section together. (do this on both sides at once) Then I climb up the existing tower, grab the rope and pull the section up and place it on the pegs. I get 2 long ropes, tie one end on the top of the top section you have set up and lean a section on the ground with the rope tied to the top of it. It's time consuming, but I generally work alone and it doesnt pay to have an extra guy sitting around in case I need to occasionally set up some scaffolding. I've set up, up to 7 sections of scaffolding by myself before.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |